HDKC-3000 Transformer On-Load Tap-Changer Tester

Description

 

HDKC-3000 Transformer On-Load Tap-Changer Tester

 

Introduction

HDKC-3000 is integrated measuring instrument used for measuring and analysis load tap changer electrical performance indicators of the power transformers and special transformers in power system. It adopts microcomputer control, through the design of precision measurement circuit, precise measure the load tap switch transition time, the transition waveform, transition resistance, three-phase synchronization and other parameters. According to the requirements and field conditions, the user can directly measure the tap - switch wire, and can also be directly connected with the transformer - phase casing and the neutral point.

Features

The instrument has the function of displaying, analyzing, storing and printing the measured data. It is significant to improve the reliability of power system operation, which can diagnose the potential fault of the load tap changer in the preventive test of power equipment and timely diagnosis of the load tap changer in transformer overhaul.

Parameters

Parameter Indicator Parameter Indicator
Voltage output >20V Power supply AC220V±10%,50Hz
Current output ≥1A Power 180W
Resistance measurement range 0.3~40Ω

20Ω-100Ω

Resistance measurement accuracy 0.1Ω~1Ω±0.1Ω, 1Ω~40Ω±5%±0.1Ω (1Ω not included)
Time measurement range 1ms~256ms Time measurement accuracy 1ms~100ms±0.1ms

100ms~250ms±1%

Three phase synchronization 0.1ms Sampling frequency 10~20KHz
Temperature 0~40℃ Humidity ≤80%RH
Dimension 420mm*350mm*220mm Weight 12kg(accessory included)

 

FAQ:

1. When can I get the price?

We usually quote within 6 hours work time after we get your inquiry. If you are very urgent to get price, please call us or tell us in your email so that we will regard your inquiry priority.

2. What about the delivery time for production?

Honestly, it depends on the order quantity and the product. Usually our leading time is within 7 working days after order confirmation.

3. What is your payment terms?

We accept EXW, FOB, CFR, CIF, DDU, ect. You can choose the one which is the most convenient and cost effective for you.

4. How much will the Shipping cost and time be?

This will depend on size of your goods and method of shipping (by sea/ by air/by Express) and your designated seaport or airport. We will be grateful if you can spare us some minutes to evaluate the cost based on the information of product.

5. Could you please tell me the Warranty Period of your product?

Our warranty period is one year free and lifelong maintenance. If the product is damaged (if not man-made damage), in the first year,we will send free parts for replacement. Over warranty, maintenance is paid service.

6. Do you have Technical Backup to all customers from different countries?

To be sure,our technical support is always available and quick response.
We are manufacturer with much on-site testing experience, thus we know how to deal with your problems. Moreover, our engineers can go to your country to support if needed.

 

Reviews

There are no reviews yet.

Be the first to review “HDKC-3000 Transformer On-Load Tap-Changer Tester”

Your email address will not be published. Required fields are marked *